This is the vizianagaram district collector office VIDEO CONFERENCE Room.
At the diversion point from NH to Vizianagaram entry there are two small boards and people who are known can easily identify the road. People who are coming first time, its very difficult. At the diversion point, an Arch with name is required and proper lighting with illuminating sign boards will help everyone. Around 10km stretch road connecting main city requires lot of repairs as well as bifurcation on the Road with proper lighting. Lot of interior / residential roads near S P Bunglow area require proper drainage system so as to avoid mosquitoes.
Good job sir 👍
Has have a good collector sir
Neat